Phillips Substation (L0445)

Phillips Substation is a 27.4 MW other interconnection project in Franklin, Washington with a current status of withdrawn. It is proposed to connect at Benton PUD's 115 kV line which is connected to BPA's Franklin-Hedges #1 115kV line.

27.4 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePhillips Substation
Queue IDL0445
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity27.4 MW
StateWashington
CountyFranklin
Point of interconnectionBenton PUD's 115 kV line which is connected to BPA's Franklin-Hedges #1 115kV line
Requested (queue) date2018-05-14
Proposed in-service date2021-10-01
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata