Pickens - Midway SS (CE) 115kV (J2727)

Pickens - Midway SS (CE) 115kV is a 140.0 MW solar interconnection project in Holmes, Mississippi with a current status of withdrawn. It is proposed to connect at Pickens - Midway SS (CE) 115kV.

140.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePickens - Midway SS (CE) 115kV
Queue IDJ2727
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity140.0 MW
StateMississippi
CountyHolmes
Point of interconnectionPickens - Midway SS (CE) 115kV
Requested (queue) date2022-09-14
Proposed in-service date2025-12-06
Operational date2025-12-06
Withdrawn date2025-07-31
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata