Pine Lake 12.47 kV (ASGI-2024-001)

Pine Lake 12.47 kV is a 17.1 MW gas interconnection project in Hardin, Iowa with a current status of operational. It is proposed to connect at Pine Lake 12.47 kV.

17.1 MWCapacity
OperationalStatus
IAMarket
GasTechnology

Project facts

Canonical namePine Lake 12.47 kV
Queue IDASGI-2024-001
Statusoperational
Source statusNone
MarketIA
TechnologyGas
Capacity17.1 MW
StateIowa
CountyHardin
Point of interconnectionPine Lake 12.47 kV
Requested (queue) date2024-05-14
Proposed in-service date
Operational date2024-05-24
Withdrawn date
Developer
Utility / transmission ownerCorn Belt Power Coop

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.