Pine Lake 161 kV Substation (J2621)

Pine Lake 161 kV Substation is a 115.0 MW battery interconnection project in St. Croix, Wisconsin with a current status of withdrawn. It is proposed to connect at Pine Lake 161 kV Substation.

115.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePine Lake 161 kV Substation
Queue IDJ2621
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity115.0 MW
StateWisconsin
CountySt. Croix
Point of interconnectionPine Lake 161 kV Substation
Requested (queue) date2022-09-14
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata