Pine Lake to Apple River 161 kV (J1657)

Pine Lake to Apple River 161 kV is a 100.0 MW solar interconnection project in St. Croix, Wisconsin with a current status of operational. It is proposed to connect at Pine Lake to Apple River 161 kV.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical namePine Lake to Apple River 161 kV
Queue IDJ1657
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateWisconsin
CountySt. Croix
Point of interconnectionPine Lake to Apple River 161 kV
Requested (queue) date2020-06-25
Proposed in-service date2022-08-01
Operational date2022-08-01
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.