Pine Lake to Three Lakes 115 kV (J1582)
Pine Lake to Three Lakes 115 kV is a 160.0 MW solar interconnection project in St. Croix, Wisconsin with a current status of withdrawn. It is proposed to connect at Pine Lake to Three Lakes 115 kV.
160.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Pine Lake to Three Lakes 115 kV |
|---|---|
| Queue ID | J1582 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 160.0 MW |
| State | Wisconsin |
| County | St. Croix |
| Point of interconnection | Pine Lake to Three Lakes 115 kV |
| Requested (queue) date | 2022-02-28 |
| Proposed in-service date | 2024-06-06 |
| Operational date | 2024-06-06 |
| Withdrawn date | 2023-01-31 |
| Developer | — |
| Utility / transmission owner | NORTHERN STATES POWER COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata