Piney Grove 3 138kV (Z1-125)

Piney Grove 3 138kV is a 10.0 MW solar interconnection project in Worcester, Maryland with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePiney Grove 3 138kV
Queue IDZ1-125
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity10.0 MW
StateMaryland
CountyWorcester
Point of interconnection
Requested (queue) date2013-10-31
Proposed in-service date2016-06-01
Operational date
Withdrawn date2014-04-02
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.