Pioneer 115 kV Substation (GEN-2022-037)

Pioneer 115 kV Substation is a 181.0 MW wind interconnection project in Williams, North Dakota with a current status of withdrawn. It is proposed to connect at Pioneer 115 kV Substation.

181.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical namePioneer 115 kV Substation
Queue IDGEN-2022-037
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity181.0 MW
StateNorth Dakota
CountyWilliams
Point of interconnectionPioneer 115 kV Substation
Requested (queue) date2022-06-23
Proposed in-service date2025-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.