Pioneer 115kV substation (GEN-2019-020)

Pioneer 115kV substation is a 35.0 MW solar interconnection project in Williams, North Dakota with a current status of withdrawn. It is proposed to connect at Pioneer 115kV substation.

35.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical namePioneer 115kV substation
Queue IDGEN-2019-020
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity35.0 MW
StateNorth Dakota
CountyWilliams
Point of interconnectionPioneer 115kV substation
Requested (queue) date2019-05-03
Proposed in-service date
Operational date
Withdrawn date2020-03-09
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.