Pioneer Sub 115kV (GEN-2017-110)
Pioneer Sub 115kV is a 100.0 MW solar interconnection project in Grant, Kansas with a current status of withdrawn. It is proposed to connect at Pioneer Sub 115kV.
100.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology
Project facts
| Canonical name | Pioneer Sub 115kV |
|---|---|
| Queue ID | GEN-2017-110 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Kansas |
| County | Grant |
| Point of interconnection | Pioneer Sub 115kV |
| Requested (queue) date | 2017-11-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2019-11-05 |
| Developer | — |
| Utility / transmission owner | SUNC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata