Pittsburg - Valiant 345kV line (GEN-2023-053)

Pittsburg - Valiant 345kV line is a 212.0 MW wind interconnection project in Pittsburg County, Oklahoma with a current status of withdrawn. It is proposed to connect at Pittsburg - Valiant 345kV line.

212.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical namePittsburg - Valiant 345kV line
Queue IDGEN-2023-053
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity212.0 MW
StateOklahoma
CountyPittsburg County
Point of interconnectionPittsburg - Valiant 345kV line
Requested (queue) date2023-10-02
Proposed in-service date2028-10-31
Operational date
Withdrawn date2024-03-18
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata