Pivot Macvean BESS (1426)

Pivot Macvean BESS is a 19.8 MW battery interconnection project in Fulton, New York with a current status of withdrawn. It is proposed to connect at Amsterdam - Ephratah 69kV (Line#7).

19.8 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical namePivot Macvean BESS
Queue ID1426
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity19.8 MW
StateNew York
CountyFulton
Point of interconnectionAmsterdam - Ephratah 69kV (Line#7)
Requested (queue) date2022-08-31
Proposed in-service date2023-03-31
Operational date
Withdrawn date
DeveloperPivot Energy
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata