PJM Queue Project AB1-186 — Other in an unlisted county, the U.S.

PJM Queue Project AB1-186 — Other in an unlisted county, the U.S. is a 3.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at REDLION 34.5 KV REDLINFC-KENT 13 KV DOVER2CT.

3.0 MWCapacity
WithdrawnStatus
PJMMarket
OtherTechnology

Project facts

Canonical namePJM Queue Project AB1-186 — Other in an unlisted county, the U.S.
Queue IDAB1-186
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyOther
Capacity3.0 MW
State
County
Point of interconnectionREDLION 34.5 KV REDLINFC-KENT 13 KV DOVER2CT
Requested (queue) date2015-11-03
Proposed in-service date2016-06-01
Operational date
Withdrawn date2018-11-26
Developer
Utility / transmission ownerDPL

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata