PJM Queue Project AG1-051 — Battery in Mercer, Pennsylvania

PJM Queue Project AG1-051 — Battery in Mercer, Pennsylvania is a 20.0 MW battery interconnection project in Mercer, Pennsylvania with a current status of withdrawn. It is proposed to connect at Maysville 69 kV III.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG1-051 — Battery in Mercer, Pennsylvania
Queue IDAG1-051
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity20.0 MW
StatePennsylvania
CountyMercer
Point of interconnectionMaysville 69 kV III
Requested (queue) date2020-07-18
Proposed in-service date2022-06-30
Operational date
Withdrawn date2024-07-18
DeveloperMC Solar Engineering
Utility / transmission ownerATSI

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata