PJM Queue Project AG2-150 — Hydro in Allegheny, Pennsylvania

PJM Queue Project AG2-150 — Hydro in Allegheny, Pennsylvania is a 5.2 MW hydro interconnection project in Allegheny, Pennsylvania with a current status of withdrawn. It is proposed to connect at River Dock 23 kV.

5.2 MWCapacity
WithdrawnStatus
PJMMarket
HydroTechnology

Project facts

Canonical namePJM Queue Project AG2-150 — Hydro in Allegheny, Pennsylvania
Queue IDAG2-150
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyHydro
Capacity5.2 MW
StatePennsylvania
CountyAllegheny
Point of interconnectionRiver Dock 23 kV
Requested (queue) date2021-02-23
Proposed in-service date2022-12-31
Operational date
Withdrawn date2025-04-07
DeveloperLock+ Hydro Friends Fund XLII, LLC
Utility / transmission ownerDL

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.