PJM Queue Project AG2-281 — Battery in Queen Anne's, Maryland

PJM Queue Project AG2-281 — Battery in Queen Anne's, Maryland is a 50.0 MW battery interconnection project in Queen Anne's, Maryland with a current status of withdrawn. It is proposed to connect at Church 138 kV.

50.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-281 — Battery in Queen Anne's, Maryland
Queue IDAG2-281
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity50.0 MW
StateMaryland
CountyQueen Anne's
Point of interconnectionChurch 138 kV
Requested (queue) date2025-02-14
Proposed in-service date2024-05-01
Operational date
Withdrawn date2025-11-24
DeveloperChurch Storage LLC
Utility / transmission ownerDPL

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.