PJM Queue Project AG2-379 — Battery in Talbot, Maryland

PJM Queue Project AG2-379 — Battery in Talbot, Maryland is a 20.0 MW battery interconnection project in Talbot, Maryland with a current status of withdrawn. It is proposed to connect at Easton - Steele 138 kV III.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-379 — Battery in Talbot, Maryland
Queue IDAG2-379
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity20.0 MW
StateMaryland
CountyTalbot
Point of interconnectionEaston - Steele 138 kV III
Requested (queue) date2021-03-29
Proposed in-service date2023-09-15
Operational date
Withdrawn date2025-07-07
DeveloperCrockett Solar I, LLC
Utility / transmission ownerDPL

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.