PJM Queue Project AG2-380 — Battery in Queen Anne's, Maryland
PJM Queue Project AG2-380 — Battery in Queen Anne's, Maryland is a 20.0 MW battery interconnection project in Queen Anne's, Maryland with a current status of active. It is proposed to connect at Carville 138 kV IV.
20.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | PJM Queue Project AG2-380 — Battery in Queen Anne's, Maryland |
|---|---|
| Queue ID | AG2-380 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | Maryland |
| County | Queen Anne's |
| Point of interconnection | Carville 138 kV IV |
| Requested (queue) date | 2024-12-17 |
| Proposed in-service date | 2023-09-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Concho Pearl Solar, LLC |
| Utility / transmission owner | DPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.