PJM Queue Project AH1-552 — Solar+Battery in Prince George's, Maryland
PJM Queue Project AH1-552 — Solar+Battery in Prince George's, Maryland is a 670.2 MW solar+battery interconnection project in Prince George's, Maryland with a current status of active. It is proposed to connect at Chalk Point units 1 and 2 (the retired coal plant).
Project facts
| Canonical name | PJM Queue Project AH1-552 — Solar+Battery in Prince George's, Maryland |
|---|---|
| Queue ID | AH1-552 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Solar+Battery |
| Capacity | 670.2 MW |
| State | Maryland |
| County | Prince George's |
| Point of interconnection | Chalk Point units 1 and 2 (the retired coal plant) |
| Requested (queue) date | 2025-03-04 |
| Proposed in-service date | 2025-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Chalk Point Steam, LLC |
| Utility / transmission owner | PEPCO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata