PJM Queue Project AH1-738 — Battery in Prince George's, Maryland

PJM Queue Project AH1-738 — Battery in Prince George's, Maryland is a 200.0 MW battery interconnection project in Prince George's, Maryland with a current status of withdrawn. It is proposed to connect at Burches Hill - Chalk Point 500 kV.

200.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-738 — Battery in Prince George's, Maryland
Queue IDAH1-738
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity200.0 MW
StateMaryland
CountyPrince George's
Point of interconnectionBurches Hill - Chalk Point 500 kV
Requested (queue) date
Proposed in-service date2029-05-31
Operational date
Withdrawn date2025-05-02
DeveloperLighthouse Keys, LLC
Utility / transmission ownerPEPCO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.