PJM Queue Project C01-1013 — Oil in Charles, Maryland

PJM Queue Project C01-1013 — Oil in Charles, Maryland is a 108.0 MW oil interconnection project in Charles, Maryland with a current status of withdrawn.

108.0 MWCapacity
WithdrawnStatus
PJMMarket
OilTechnology

Project facts

Canonical namePJM Queue Project C01-1013 — Oil in Charles, Maryland
Queue IDC01-1013
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyOil
Capacity108.0 MW
StateMaryland
CountyCharles
Point of interconnection
Requested (queue) date2025-05-30
Proposed in-service date
Operational date
Withdrawn date2025-06-02
DeveloperChalk Point Steam, LLC
Utility / transmission ownerPEPCO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.