PJM-CPLE (AD1-079 4899239)

PJM-CPLE is a 130.0 MW gas interconnection project with a current status of withdrawn.

130.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePJM-CPLE
Queue IDAD1-079 4899239
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity130.0 MW
StateN/A
CountyN/a
Point of interconnection
Requested (queue) date2017-09-01
Proposed in-service date
Operational date
Withdrawn date2017-09-28
Developer
Utility / transmission ownerPJM

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.