PJM-TVA (AJ1-004 5279789)

PJM-TVA is a 250.0 MW gas interconnection project with a current status of withdrawn.

250.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePJM-TVA
Queue IDAJ1-004 5279789
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity250.0 MW
StateN/A
CountyN/a
Point of interconnection
Requested (queue) date2023-05-01
Proposed in-service date
Operational date
Withdrawn date2024-05-15
Developer
Utility / transmission ownerPJM

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata