PJM-WEC (AI1-071 5201758)
PJM-WEC is a 60.0 MW gas interconnection project with a current status of withdrawn.
60.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | PJM-WEC |
|---|---|
| Queue ID | AI1-071 5201758 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Gas |
| Capacity | 60.0 MW |
| State | N/A |
| County | N/a |
| Point of interconnection | — |
| Requested (queue) date | 2022-06-22 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2022-09-14 |
| Developer | — |
| Utility / transmission owner | PJM |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata