Plantation 115 kV Substation (J868)

Plantation 115 kV Substation is a 37.2 MW generation interconnection project in Concordia Parish, Louisiana with a current status of operational. It is proposed to connect at Plantation 115 kV Substation.

37.2 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical namePlantation 115 kV Substation
Queue IDJ868
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity37.2 MW
StateLouisiana
CountyConcordia Parish
Point of interconnectionPlantation 115 kV Substation
Requested (queue) date2017-06-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.