Pleasant Prairie - Arcadian 345.0kV (J3330)

Pleasant Prairie - Arcadian 345.0kV is a 705.0 MW gas interconnection project in Kenosha, Wisconsin with a current status of withdrawn. It is proposed to connect at Pleasant Prairie - Arcadian 345.0kV.

705.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePleasant Prairie - Arcadian 345.0kV
Queue IDJ3330
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity705.0 MW
StateWisconsin
CountyKenosha
Point of interconnectionPleasant Prairie - Arcadian 345.0kV
Requested (queue) date2024-04-17
Proposed in-service date2028-05-01
Operational date2028-05-01
Withdrawn date2025-09-11
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.