Plover 115 kV Substation (J1573 substation) (J2335)

Plover 115 kV Substation (J1573 substation) is a 200.0 MW battery interconnection project in Portage, Wisconsin with a current status of withdrawn. It is proposed to connect at Plover 115 kV Substation (J1573 substation).

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePlover 115 kV Substation (J1573 substation)
Queue IDJ2335
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateWisconsin
CountyPortage
Point of interconnectionPlover 115 kV Substation (J1573 substation)
Requested (queue) date2022-09-14
Proposed in-service date2025-09-01
Operational date2025-09-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.