Plover is a 250.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Plover.
250.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | Plover |
|---|---|
| Queue ID | J4260 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Generation |
| Capacity | 250.0 MW |
| State | — |
| County | Portage |
| Point of interconnection | Plover |
| Requested (queue) date | 2026-08-25 |
| Proposed in-service date | 2031-06-01 |
| Operational date | 2031-06-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMERICAN TRANSMISSION COMPANY |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-03 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata