Plymouth 950 MW (L0703)

Plymouth 950 MW is a 950.0 MW other interconnection project with a current status of active. It is proposed to connect at McNary-John Day No. 2 500 kV line or McNary-Ross No. 1 345 k V line or McNary-Horse Heaven No. 1 230 kV.

950.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical namePlymouth 950 MW
Queue IDL0703
Statusactive
Source statusRECEIVED
Market
TechnologyOther
Capacity950.0 MW
State
CountyBenton, Wa
Point of interconnectionMcNary-John Day No. 2 500 kV line or McNary-Ross No. 1 345 k V line or McNary-Horse Heaven No. 1 230 kV
Requested (queue) date2026-07-06
Proposed in-service date2029-01-31
Operational date
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata