Plymouth Data Center Campus (L0622)

Plymouth Data Center Campus is a 864.0 MW other interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at McNary-John Day No. 2 500 kV line.

864.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePlymouth Data Center Campus
Queue IDL0622
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity864.0 MW
StateWashington
CountyBenton
Point of interconnectionMcNary-John Day No. 2 500 kV line
Requested (queue) date2024-09-06
Proposed in-service date2028-09-01
Operational date
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata