Pony Meadows - El Paso 138kV Line Break (GEN-2019-062)

Pony Meadows - El Paso 138kV Line Break is a 90.0 MW battery interconnection project in Butler, Kansas with a current status of withdrawn. It is proposed to connect at Pony Meadows - El Paso 138kV Line Break.

90.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical namePony Meadows - El Paso 138kV Line Break
Queue IDGEN-2019-062
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity90.0 MW
StateKansas
CountyButler
Point of interconnectionPony Meadows - El Paso 138kV Line Break
Requested (queue) date2019-05-24
Proposed in-service date2027-12-31
Operational date
Withdrawn date2023-09-28
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata