Pony Meadows - El Paso 138kV Line Break (GEN-2019-062)
Pony Meadows - El Paso 138kV Line Break is a 90.0 MW battery interconnection project in Butler, Kansas with a current status of withdrawn. It is proposed to connect at Pony Meadows - El Paso 138kV Line Break.
90.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology
Project facts
| Canonical name | Pony Meadows - El Paso 138kV Line Break |
|---|---|
| Queue ID | GEN-2019-062 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Battery |
| Capacity | 90.0 MW |
| State | Kansas |
| County | Butler |
| Point of interconnection | Pony Meadows - El Paso 138kV Line Break |
| Requested (queue) date | 2019-05-24 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | 2023-09-28 |
| Developer | — |
| Utility / transmission owner | WERE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.