Port Angeles 20 MW Load Addition (L0608)

Port Angeles 20 MW Load Addition is a 20.0 MW other interconnection project in Clallam, Washington with a current status of operational. It is proposed to connect at Port Angeles Substation.

20.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical namePort Angeles 20 MW Load Addition
Queue IDL0608
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity20.0 MW
StateWashington
CountyClallam
Point of interconnectionPort Angeles Substation
Requested (queue) date2024-05-20
Proposed in-service date
Operational date2027-05-21
Withdrawn date
DeveloperCity of Port Angeles
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.