Port Angeles Substation (L0465)

Port Angeles Substation is a 50.0 MW other interconnection project in Clallam, Washington with a current status of withdrawn. It is proposed to connect at BPA Port Angeles Substation.

50.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePort Angeles Substation
Queue IDL0465
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity50.0 MW
StateWashington
CountyClallam
Point of interconnectionBPA Port Angeles Substation
Requested (queue) date2019-07-19
Proposed in-service date2022-10-03
Operational date
Withdrawn date
DeveloperCity of Port Angeles
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.