Port Morris Energy Storage (C24-081)
Port Morris Energy Storage is a 130.0 MW battery interconnection project in Bronx, New York with a current status of active. It is proposed to connect at Hell Gate Annex 138kV.
130.0 MWCapacity
ActiveStatus
JMarket
BatteryTechnology
Project facts
| Canonical name | Port Morris Energy Storage |
|---|---|
| Queue ID | C24-081 |
| Status | active |
| Source status | 6 |
| Market | J |
| Technology | Battery |
| Capacity | 130.0 MW |
| State | New York |
| County | Bronx |
| Point of interconnection | Hell Gate Annex 138kV |
| Requested (queue) date | 2024-08-08 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | New York Power Authority & LS Power Grid New York Corporation I |
| Utility / transmission owner | NYPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata