Post Oak 34.5kV (ASGI-2017-014)
Post Oak 34.5kV is a 40.0 MW solar interconnection project in Post Oak, Missouri with a current status of withdrawn. It is proposed to connect at Post Oak 34.5kV.
40.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology
Project facts
| Canonical name | Post Oak 34.5kV |
|---|---|
| Queue ID | ASGI-2017-014 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | MO |
| Technology | Solar |
| Capacity | 40.0 MW |
| State | Missouri |
| County | Post Oak |
| Point of interconnection | Post Oak 34.5kV |
| Requested (queue) date | 2017-06-05 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2023-03-13 |
| Developer | — |
| Utility / transmission owner | KCPL |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.