Pouch Energy Storage System (C24-333)

Pouch Energy Storage System is a 47.1 MW battery interconnection project in Kings, New York with a current status of active. It is proposed to connect at Fox Hills 138kV Substation.

47.1 MWCapacity
ActiveStatus
JMarket
BatteryTechnology

Project facts

Canonical namePouch Energy Storage System
Queue IDC24-333
Statusactive
Source status6
MarketJ
TechnologyBattery
Capacity47.1 MW
StateNew York
CountyKings
Point of interconnectionFox Hills 138kV Substation
Requested (queue) date2024-10-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperNew York Power Authority & LS Power Grid New York Corporation I
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.