Prairie Creek - Stony Point 115kV (J4155)

Prairie Creek - Stony Point 115kV is a 195.0 MW battery interconnection project in Linn, Iowa with a current status of operational. It is proposed to connect at Prairie Creek - Stony Point 115kV.

195.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical namePrairie Creek - Stony Point 115kV
Queue IDJ4155
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity195.0 MW
StateIowa
CountyLinn
Point of interconnectionPrairie Creek - Stony Point 115kV
Requested (queue) date2025-10-06
Proposed in-service date2029-09-03
Operational date2029-09-03
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata