Primary - Osage Substation ½ mile south (bus #514742) (GEN-2015-035)

Primary - Osage Substation ½ mile south (bus #514742) is a 22.0 MW gas interconnection project in Ponca, Oklahoma with a current status of withdrawn. It is proposed to connect at Primary - Osage Substation ½ mile south (bus #514742).

22.0 MWCapacity
WithdrawnStatus
OKMarket
GasTechnology

Project facts

Canonical namePrimary - Osage Substation ½ mile south (bus #514742)
Queue IDGEN-2015-035
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyGas
Capacity22.0 MW
StateOklahoma
CountyPonca
Point of interconnectionPrimary - Osage Substation ½ mile south (bus #514742)
Requested (queue) date2015-09-10
Proposed in-service date
Operational date
Withdrawn date2016-02-04
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata