WAPA Rocky Mountain Queue Project 2022-G10 — Solar+Battery in 2, the U.S.

WAPA Rocky Mountain Queue Project 2022-G10 — Solar+Battery in 2, the U.S. is a 300.0 MW solar+battery interconnection project with a current status of withdrawn. It is proposed to connect at Dave Johnston 230kV substation.

300.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameWAPA Rocky Mountain Queue Project 2022-G10 — Solar+Battery in 2, the U.S.
Queue ID2022-G10
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar+Battery
Capacity300.0 MW
State
County2
Point of interconnectionDave Johnston 230kV substation
Requested (queue) date2022-06-15
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata