Arizona Public Service Queue Project Q162 — Solar in Yavapai Az, the U.S.

Arizona Public Service Queue Project Q162 — Solar in Yavapai Az, the U.S. is a 19.0 MW solar interconnection project with a current status of operational. It is proposed to connect at Creek Substation Moenkopi-Cedar.

19.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q162 — Solar in Yavapai Az, the U.S.
Queue IDQ162
Statusoperational
Source statusInterconnection Energy
Market
TechnologySolar
Capacity19.0 MW
State
CountyYavapai Az
Point of interconnectionCreek Substation Moenkopi-Cedar
Requested (queue) date2010-08-06
Proposed in-service date
Operational date2012-10-15
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation 500 kV Moenkopi-CedarCreek Substation Moenkopi-Cedarlow
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata