Arizona Public Service Queue Project Q20 — Gas in Maricopa Az, the U.S. is a 2,334.0 MW gas interconnection project with a current status of operational. It is proposed to connect at 500kv 69 kV.

2,334.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q20 — Gas in Maricopa Az, the U.S.
Queue IDQ20
Statusoperational
Source statusInterconnection
Market
TechnologyGas
Capacity2,334.0 MW
State
CountyMaricopa Az
Point of interconnection500kv 69 kV
Requested (queue) date2005-09-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameGila River 500kv El Sol-Lukefield 69 kV500kv 69 kVlow
2026-08-10phaseSystem Impactlow
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.