Arizona Public Service Queue Project Q227 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q227 — Solar+Battery in Az, the U.S. is a 500.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at Wash 500kV POI.

500.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q227 — Solar+Battery in Az, the U.S.
Queue IDQ227
Statusactive
Source statusAmended & Filed Interconnection Service Interconnection Current Status Request Network Resource
Market—
TechnologySolar+Battery
Capacity500.0 MW
State—
CountyAz
Point of interconnectionWash 500kV POI
Requested (queue) date2015-08-17
Proposed in-service date2021-12-22
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_nameWash 500kV 115kVWash 500kV POIlow
2026-09-21phase—Generationlow
2026-09-21operational_date2021-12-22—medium
2026-09-21proposed_online_date—2021-12-22medium
2026-09-21statusoperationalactivehigh
2026-08-10poi_nameHoodoo Wash 500kV Saguaro 115kVWash 500kV 115kVlow
2026-08-03new_project—operationalhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-10-12
Page data generated2026-11-26

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.