Arizona Public Service Queue Project Q230 — Solar in Navajo Az, the U.S.

Arizona Public Service Queue Project Q230 — Solar in Navajo Az, the U.S. is a 200.0 MW solar interconnection project with a current status of active. It is proposed to connect at 500kV Substation Substation.

200.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q230 — Solar in Navajo Az, the U.S.
Queue IDQ230
Statusactive
Source statusConstruction Interconnection with APS Network
Market
TechnologySolar
Capacity200.0 MW
State
CountyNavajo Az
Point of interconnection500kV Substation Substation
Requested (queue) date2015-09-30
Proposed in-service date2021-12-24
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameCholla 500kV Substation Saguaro Substation500kV Substation Substationlow
2026-08-10phaseSIS FAS MMAlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata