Arizona Public Service Queue Project Q275 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q275 — Solar+Battery in Az, the U.S. is a 1,000.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at Substation.

1,000.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q275 — Solar+Battery in Az, the U.S.
Queue IDQ275
Statusactive
Source statusIn Design Interconnection Service Network Resource
Market—
TechnologySolar+Battery
Capacity1,000.0 MW
State—
CountyAz
Point of interconnectionSubstation
Requested (queue) date2018-03-30
Proposed in-service date2020-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name500kV SubstationSubstationlow
2026-09-21phaseSISGenerationlow
2026-08-10poi_nameCholla 500kV Substation500kV Substationlow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.