Arizona Public Service Queue Project Q348 — Solar in Coconino Az, the U.S.

Arizona Public Service Queue Project Q348 — Solar in Coconino Az, the U.S. is a 300.0 MW solar interconnection project with a current status of active. It is proposed to connect at Line.

300.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q348 — Solar in Coconino Az, the U.S.
Queue IDQ348
Statusactive
Source statusResource (Draft) Interconnection Cluster: Energy
Market
TechnologySolar
Capacity300.0 MW
State
CountyCoconino Az
Point of interconnectionLine
Requested (queue) date2020-09-22
Proposed in-service date2024-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_name500kV Line Requested POILinelow
2026-08-10phase+low
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.