Arizona Public Service Queue Project Q393 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q393 — Solar+Battery in Az, the U.S. is a 500.0 MW solar+battery interconnection project with a current status of active.

500.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q393 — Solar+Battery in Az, the U.S.
Queue IDQ393
Statusactive
Source statusPhase 4 Facilities Study Interconnection Service Network Transitional Cluster: Resource
Market—
TechnologySolar+Battery
Capacity500.0 MW
State—
CountyAz
Point of interconnection—
Requested (queue) date2021-03-31
Proposed in-service date2024-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name500 kV line - El Dorado—low
2026-09-21phase—Generationlow
2026-08-10poi_nameMoenkopi 500 kV line Moenkopi - El Dorado500 kV line - El Doradolow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-10-12
Page data generated2026-11-26

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata