Arizona Public Service Queue Project Q401 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q401 — Solar+Battery in Az, the U.S. is a 700.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at - El Dorado 500 kV line.

700.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q401 — Solar+Battery in Az, the U.S.
Queue IDQ401
Statusactive
Source statusLGIA (Draft) Interconnection Service Energy Transitional Cluster:
Market—
TechnologySolar+Battery
Capacity700.0 MW
State—
CountyAz
Point of interconnection- El Dorado 500 kV line
Requested (queue) date2021-09-27
Proposed in-service date2026-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_nameline- El Dorado 500 kV linelow
2026-09-21phase—Generationlow
2026-08-10poi_name500 kV linelinelow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata