Arizona Public Service Queue Project Q437 — Solar+Battery in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q437 — Solar+Battery in Maricopa Az, the U.S. is a 300.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at (Q276 POI.

300.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q437 — Solar+Battery in Maricopa Az, the U.S.
Queue IDQ437
Statusactive
Source status(Executed) Interconnection Cluster: Energy
Market
TechnologySolar+Battery
Capacity300.0 MW
State
CountyMaricopa Az
Point of interconnection(Q276 POI
Requested (queue) date2021-09-30
Proposed in-service date2024-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation (Q276 POI 500kV)(Q276 POIlow
2026-08-10phaseCluster Study (Phaselow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.