Arizona Public Service Queue Project Q44 — Solar in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q44 — Solar in Maricopa Az, the U.S. is a 280.0 MW solar interconnection project with a current status of operational. It is proposed to connect at 230kV Switchyard.

280.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q44 — Solar in Maricopa Az, the U.S.
Queue IDQ44
Statusoperational
Source statusInterconnection Energy
Market
TechnologySolar
Capacity280.0 MW
State
CountyMaricopa Az
Point of interconnection230kV Switchyard
Requested (queue) date2008-02-28
Proposed in-service date
Operational date2013-05-01
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSwitchyard230kV Switchyardlow
2026-08-10phaseImpact,low
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata