Arizona Public Service Queue Project Q444 — Solar+Battery in Navajo, the U.S.

Arizona Public Service Queue Project Q444 — Solar+Battery in Navajo, the U.S. is a 60.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at and .04 miles Hwy 87 Winslow,.

60.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q444 — Solar+Battery in Navajo, the U.S.
Queue IDQ444
Statusactive
Source status4 Facilities Resource Interconnection Cluster: Network
Market
TechnologySolar+Battery
Capacity60.0 MW
State
CountyNavajo
Point of interconnectionand .04 miles Hwy 87 Winslow,
Requested (queue) date2022-03-24
Proposed in-service date2024-04-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameof Hwy 99 and .04 miles East of Hwy 87 Winslow, AZand .04 miles Hwy 87 Winslow,low
2026-08-10phaseCluster Study (Phaselow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.